hMa | HANRAHAN MEYERS ARCHITECTS | DESIGN IS A FRAME TO NATURE.

PROFILE | PROJECTS | NEW & IN PROGRESS | BOOKS BY hMa | LINKS
AWARDS & PUBLICATIONS | CONTACT | hMa BLOG | CULTURAL CONVERSATIONS
WORK FOR hMa | hMa E-ZINE | hMa STORE | hMa RESEARCH
HOME | FACEBOOK | TWITTER


residences | educational spaces | performance spaces | green | arts spaces |
recreation spaces
| sacred spaces | workspaces | exhibition design | furniture |
masterplans and landscapes | prototypes

bridge house/studio
broadway loft
holley house
ash 4 ways/white space
see-thru house
holley loft
white's hill road
sagaponac house
glaser residence
singer residence
delmonico/washburn
hudson river house
inside out house


 

project: Bridge-Studio

location:  Easton, PA

size:  1,200 s.f.

date:  construction begins July 2006

 

Bridge-Studio is a new artist studio building in Easton, Pennsylvania, designed for a couple who are both artists and gallery owners in New York City.  Bridge-Studio houses a painting studio for the husband on the east side, and a writing studio on the west side.  An open air breezeway runs through the center of Bridge-Studio, connecting back to the site with an entry ramp to the north.  Bridge-Studio is entered by walking up the entry ramp, into the open breezeway overlooking the Delaware River, approximately 120 feet below the site.

The breezeway fireplace hearth houses a flue for a fireplace in the breezeway, in the writing studio, and a third fireplace in the outdoor area below the deck.  In addition to producing their own bodies of work, the clients own a prominent gallery in Williamsburg, New York, and a gallery/ event space, also in Williamsburg.  The clients regularly entertain artists and clients from their New York gallery at their home in Pennsylvania. The couple’s desire for an appropriate setting to entertain artist friends created part of the program for the Bridge-Studio.

The architects designed Bridge-Studio as a kit-of-parts, as the studio is being built by the husband, and has been in construction since 2005.  The project is nearly complete.  The insulation and the underside of the roof needs to be installed, as well as the insulation and the underside of the deck below.  All exterior/ interior walls need to be insulated and sheet-rocked.  The fireplace hearth is built, and the client has partially installed the exterior stone sheathing.  The final construction will include installation of balcony and ramp rails, as required for inspection for the certificate of occupancy. 

This project is in two parts, as the architects designed the building as a kit-of-parts, and have proposed the building as a proto-type for other settings, internationally.  The plans for the building have been sent to clients in other cities, and are available for free through the architects’ website. Plans are also available through the clients’ gallery.

 

 



















Construction Progress Photographs:



 




    